Dismantling of the Muel wind farm

Year: 2025

Customers: RWE

Scope: Dismantling, transport, recovery and recycling of the turbines at the Muel wind plant

Turbines: 27 Nordtank 600/43 installed in 1998

Location: Muel, Zaragoza (Spain)

Description: mechanical dismantling, transport to the RenerCycle facilities in Falces where the different components are prepared for their final destination, either a second life or recycling

The project has obtained Bureau Veritas ZeroWaste certification with 99.8% of the material recovered or recycled

If you would like to know more about how we achieved this impressive 99.8 per cent, you can read this article.

Other projects